Building massive 2-meter thick turf walls requires mastering wetland agronomy and organic masonry geometry. Sedge bog wetlands (mýri) yield sod with intense root-felt density (Carex nigra and Carex rostrata) capable of resisting shear stresses. Masons cut two complementary units: strengur (flexible, thin continuous sod ribbons 1.0 m long) and klömbruhnaus (wedge-shaped sod blocks with angled tails). On the exterior wall face, strengur strips are laid in alternating 45-degree herringbone courses (fiskislóð). This diagonal interlocking prevents continuous horizontal slip planes, distributes settling loads evenly, sheds horizontal driving sleet, and fuses into a monolithic living earth wall.
At a Glance: Key Takeaways
- Botanical Matrix: Dense Carex sedge rhizomes, cotton grass, and dwarf willow roots
- Cutting Spades: Curved crescent turf spade (torf-ljár) and flensing spade (reka)
- Strengur Dimensions: 100 cm long × 15-20 cm wide × 5-7 cm thick ribbons
- Hnaus Dimensions: 50 cm long × 25 cm wide × 15 cm thick wedge blocks
- Wall Face Pattern: Herringbone (fiskislóð) with alternating 45° diagonal courses
- Wall Inward Batter: 1:5 slope (inward lean of 10-15 cm per meter of height)
Rhizome Botany & The Science of Root-Felt Density
The mechanical integrity of an un-mortared turf wall does not come from the soil itself, but from the microscopic biological network of living plant roots. Traditional turf cutters (torfmenn) strictly avoided dry hillside grasslands, which contain loose volcanic tephra ash and shallow, sparse grass roots that crumble when handled.
Construction turf was harvested exclusively from waterlogged sedge bogs (flói and mýri). In these anaerobic wetland soils, common sedge (Carex nigra), bottle sedge (Carex rostrata), and alpine cotton grass produce dense, fibrous rhizome mats extending 30 to 50 cm below the surface. The high tensile strength of the living sedge roots functions exactly like steel rebar in reinforced concrete: resisting tensile bending forces, preventing water erosion, and allowing long ribbons of turf to be rolled, transported on pack horses, and bent around wall corners without fracturing.
Turf Cutting Tools: The Torf-Ljár & Reka Morphology
Harvesting turf required specialized forged iron tools developed over centuries. The primary tool for cutting turf ribbons was the torf-ljár (turf scythe or crescent spade)—a long wooden shaft fitted with a broad, curved, razor-sharp iron blade set at a right angle to the handle.
To cut strengur, the cutter walks backward across the bog, slicing through the root carpet in continuous parallel grooves spaced 18 cm apart. A second craftsman using a flat spade (reka) slices horizontally beneath the roots at a calibrated depth of 5 cm, peeling up continuous sod ribbons up to two meters long. For thick load-bearing blocks—klömbruhnaus—a heavy rectangular turf spade (torf-skófla) is driven vertically into the earth, cutting blocks with a trapezoidal profile: a thick, square outer face that forms the exterior wall surface and an elongated, tapering tail that anchors deep into the interior core of the wall.
Herringbone Laying (Fiskislóð) & Compaction Mechanics
Laying a turf wall is an exercise in gravity compaction and geometric interlocking. Traditional turf walls are built with a distinct double-skin construction: an exterior face of patterned turf, an interior face of flat turf blocks, and a central core of loose peat earth and gravel.
On the exterior face, the master mason lays strengur strips in fiskislóð (herringbone or fish-bone pattern). One course is laid with strips sloping 45 degrees downward from left to right; the subsequent course is laid sloping 45 degrees downward from right to left, separated by a single flat horizontal leveling layer (strenglag). This herringbone geometry provides two vital advantages: (1) it eliminates continuous horizontal and vertical joint seams where driving rain can penetrate; and (2) as the wall naturally settles by 15% to 20% over its first two years, the angled blocks wedge tightly against one another, locking the wall under increasing compression. Every two courses, the central core is tamped firmly with heavy wooden rammers (drepill), creating an airtight, draft-free thermal barrier.
Icelandic Turf Building Units and Material Specifications
Use this reference table to calculate exact physical dimensions, ratios, and specifications before purchasing:
| Turf Unit Name | Dimensions (L x W x Thickness) | Harvesting Tool | Structural Wall Location | Functional Advantage |
|---|---|---|---|---|
| Strengur (Ribbon) | 100 - 150 × 18 × 5 cm | Crescent turf scythe (Torf-ljár) | Exterior herringbone facing & leveling layers | High flexibility; binds wall horizontally |
| Klömbruhnaus (Wedge Block) | 50 × 25 × 15 cm (tapered) | Heavy rectangular turf spade (Reka) | Massive corner quoins and door jambs | Deep tail anchors face into wall core |
| Snidda (Diamond Block) | 35 × 25 × 10 cm (parallelogram) | Angled cutting spade | Upper gables and window splay reveals | Smooth angled finish on window openings |
| Torfþak (Roof Sod) | 60 × 40 × 10 cm (living grass) | Flat skimming spade | Top finish layer of double-pitch roof | Living root knit anchors soil against wind |
Practical Constraints
Every successful decoration project must account for physical and environmental constraints:
Rapid Decomposition of Turf Exposed to Severe Heat or Low Humidity
In regions with warm, dry summers, bog turf dries out completely, killing the living root matrix and causing wind deflation. Mitigation: Turf construction is strictly adapted to cold, damp, hyper-maritime sub-Arctic climates; maintain roof and wall grass hydration with periodic irrigation if droughts occur.
Execution Blueprint & Craftsmanship Sequence
Execute this professional sequence to achieve flawless results without backtracking:
Testing Rhizome Felt Density
Select waterlogged Carex sedge bog; cut a 30 cm test sod and verify that lifting the sod by its corner does not tear the tangled root network.
Slicing Longitudinal Strengur Grooves
Draw the curved torf-ljár scythe backward across the meadow to slice parallel 5 cm deep lines spaced exactly 18 cm apart through the root carpet.
Peeling Continuous Sod Ribbons
Drive a flat reka spade horizontally beneath the root lines at 5 cm depth, peeling up flexible 1.2-meter long strengur ribbons and rolling for transport.
Cutting Tapered Anchor Blocks
Chop heavy klömbruhnaus wedge blocks with angled side cuts, ensuring an extended 35 cm tail to anchor into the wall center.
Alternating 45-Degree Diagonal Layers
Bed turf blocks over the basalt stone plinth in 45-degree diagonal courses, alternating direction every layer with a flat horizontal leveling strip.
Compacting Earth Core and Enforcing Inward Slope
Fill the wall center with loose peat soil; tamp with wooden rammers every 20 cm, maintaining a strict 1:5 inward batter slope on exterior faces.
Common Mistakes & Countermeasures
Avoid these costly errors that compromise aesthetics, ergonomics, and budget:
Harvesting Turf in Dry Midsummer Drought Conditions
Laying Turf Walls Perfectly Vertical (90 Degrees)
Project Execution Checklist
Track your physical progress. Checkboxes persist automatically on this device:
Frequently Asked Questions
How long does a freshly harvested turf block remain viable for wall laying?
Turf blocks must be laid within 3 to 5 days of harvest. If allowed to sit in dry air, the cut root rhizomes die and shrink, reducing the block's tensile strength by up to 60%. Masons coordinate cutting and laying concurrently to keep the sod living and moist.
Why does herringbone turf laying prevent water ingress?
In standard horizontal brick-style running bond, horizontal joint planes allow wind-driven rain to puddle and seep inward. In herringbone laying (fiskislóð), all joint seams slope diagonally downward at 45 degrees, forcing wind-driven water to drain outward and downward along the slope of the blocks toward the stone plinth.